Consent to Establish & Operate (CTE & CTO)

Our Services

Sewage Treatment Plant (STP)
Effluent Treatment Plant (ETP)
Water Treatment Plant (WTP)
De-Mineralised Plant (DM Plant)
Rain Water Harvesting
Reverse Osmosis System (RO) (Domestic / Commercial)
CTE & CTO for Factory

Do you need CTE and CTO for your factory?

So you are in the right place

Give your message

Why its need mandatory for your factory?

Setting up a new Industry requires many approvals from Government Authorities. One of the major requirements is to obtain the Consent from the State Pollution Control Board.

In case the unit is covered under Hazardous and Other Wastes (Management & Transboundary Movement) Rules, 2016, E-Waste (Management) Rules, 2016, Plastic Waste Management Rules, 2016 and Bio-Medical Waste Management Rules, 2016, it shall simultaneously apply for the grant of consent under Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981.

TYPES OF CONSENT

There are two types of the Consent i.e. Consent to Establish (CTE), and Consent to Operate (CTO).

  1. Consent to Establish: This consent is required to be obtained before establishing any Industry, Plant, or Process. The Consent to Establish is the primary clearance.
  2. Consent to Operate: Once the Industry, Plant, or Process being established according to mandatory pollution control systems, the units are required to obtain consent to operate.

DOCUMENTS REQUIRED

While every state has its specific requirement, the following set of documents are usually required across every state for seeking consent under Water Act, 1974 and Air Act, 1981

Consent to Establish

  • Site Plan/Location Plan of the Industry
  • Detailed Project Report which includes the details of raw material, product to be manufactured, the capital cost of the unit (land, building, and plant machinery), water-balance, source of water, and its required quantity
  • Land documents such as Registration deed/ Rent deed/Lease deed
  • Details of Water Pollution Control/Air Pollution Control instruments
  • MOA /partnership Deed

Consent to Operate

  • Copy of last consent issued
  • Layout plan showing the details of all manufacturing processes
  • Latest analysis report of solid waste, effluent, hazardous wastes, and fuel gases
  • Copy of balance sheet duly attested by CA or CA certificate
  • Detail of land in case the effluent is discharged on land for percolation
  • Occupation certificate issued by Town & Country Planning Department, in case of Building & construction projects/area development projects.
  • MOA /partnership Deed